-
Make sure to order system chassis
with all the accessories needed:
-
Pillow or no pillow as defined by
the amount of water distribution station.
-
Make sure that within each cushion
has internal Aseptic bag.
-
Set port tubing connectors.
-
Platform, integrated Slimming stage
or multiple fountains.
-
If necessary, depending on the status
of the water fountain water fountain at a set number
of division.
-
If the use of pillows will be no
stage - make sure the hand pump for a pillow that
is not on stage.
-
Load on a number of kits suitable
vehicle according to the number of water distribution
stations.
-
Coordinate arrival times as much
as possible with the Commissioner of the division
/ truck division / or verify location near the station
Hidrenat division.
-
Close the tap and set out water and
emptied the water fountain.
-
Disconnect the piping leading to the
water fountain.
-
Open the port set to connect the hose
from a truck or Hidrenat distribution.
-
Open the faucet and fill with water
again and fill the pillow.
-
Close valve and repeat again on each
water fountain connection operations.
5.final
-
Close the tap and set the port.
-
Disconnect the plumbing water fountain.
-
Stage or period of the water fountain
water fountain stands fold.
-
Check first whether it is necessary
to transfer the remaining water and any other source
pillow or small containers.
-
Open the tap and emptied all the water
remaining in the system.
-
Fold the pillow and put it in her
carrying bag.
-
Fold the stage and return it to its
chassis.
-
Load on the vehicle all assessments
intended to return to the warehouse.
-
Make sure the neck and packed all
the pieces before returning to the warehouse.
Recommended to ensure completeness and integrity of equipment
for reuse
Please Warn of any malfunction, defect, or lack of by
the Knesset system back to the warehouse.